All datacentersFacility 74 / 93
Site record / Epoch AI
Anthropic Barber Lake
Cipher Mining · United States
Compute
0
H100-equivalent GPUs
IT power
0 MW
Current capacity
Capital cost
$0B
2025 USD · estimate

Site location
Loading site map
Site location
Anthropic Barber Lake
OpenStreetMap · Positron
OpenStreetMap · Positron styleOpen map
16 core fields5 timeline records2 chip records
Snapshot September 28, 2026
Source record
Facility fields
All fields supplied in Epoch AI’s data-center table. Values are kept as published.
- Name
- Anthropic Barber Lake
- Current H100 equivalents
- 0
- Current power (MW)
- 0
- Current total capital cost (2025 USD billions)
- 0
- Owner
- Cipher Mining
- Users
- Anthropic
- Selected Sources
- - Cipher signs 168 MW AI hosting deal with Fluidstack, Google backs it (Sep 2025) - Cipher adds 56 MW gross to reach 300 MW at Barber Lake (Nov 2025) - Cipher 8-K exhibit: 207 MW total critical IT load (SEC, Nov 2025) - Anthropic to expand use of Google Cloud TPUs (Oct 2025) - Anthropic $50B US AI infrastructure with Fluidstack (Nov 2025) - DCD: Cipher secures Fluidstack as customer, Google as investor - Air quality permit listing 60 x 3 MW plus 60 x 3.1MW backup generators
- Calculations sheet
- https://docs.google.com/spreadsheets/d/1sGialfBa0kKKX7Vm8qL_R6Ce3PSzt7NawpAnWolnTVc/edit
- Project
- Not reported
- Current chip types
- Not reported
- All chip types
- TPU v7
- Investors
- Not reported
- Construction companies
- Not reported
- Energy companies
- Not reported
- Country
- United States
- Address
- Not reported