All datacentersFacility 77 / 93
Site record / Epoch AI
Crusoe Abilene Expansion
Microsoft · United States · 5502 Spinks Rd, Abilene, TX 79601
Compute
0
H100-equivalent GPUs
IT power
0 MW
Current capacity
Capital cost
$0B
2025 USD · estimate

Site location
Loading site map
Site location
Crusoe Abilene Expansion
OpenStreetMap · Positron
OpenStreetMap · Positron styleOpen map
16 core fields4 timeline records2 chip records
Snapshot September 28, 2026
Source record
Facility fields
All fields supplied in Epoch AI’s data-center table. Values are kept as published.
- Name
- Crusoe Abilene Expansion
- Current H100 equivalents
- 0
- Current power (MW)
- 0
- Current total capital cost (2025 USD billions)
- 0
- Owner
- Microsoft
- Users
- Microsoft #likely
- Selected Sources
- - Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace them - Air Permit Application for the buildings, featuring blueprints on p.391 (via Aterio) - Partnership Announcement with Microsoft
- Calculations sheet
- https://docs.google.com/spreadsheets/d/1FpTJoXhLRzKTX8S3kSnPlT8V66ad_htJPuvaYPiHAsE/edit?usp=sharing
- Project
- Not reported
- Current chip types
- Not reported
- All chip types
- Rubin
- Investors
- NVIDIA
- Construction companies
- Not reported
- Energy companies
- Not reported
- Country
- United States
- Address
- 5502 Spinks Rd, Abilene, TX 79601