All datacentersFacility 83 / 93
Site record / Epoch AI
Meta Hyperion
Meta · United States · Holly Ridge, LA 71269
Project Hyperion
Compute
0
H100-equivalent GPUs
IT power
0 MW
Current capacity
Capital cost
$0B
2025 USD · estimate

Site location
Loading site map
Site location
Meta Hyperion
OpenStreetMap · Positron
OpenStreetMap · Positron styleOpen map
16 core fields5 timeline records1 chip records
Snapshot September 28, 2026
Source record
Facility fields
All fields supplied in Epoch AI’s data-center table. Values are kept as published.
- Name
- Meta Hyperion
- Current H100 equivalents
- 0
- Current power (MW)
- 0
- Current total capital cost (2025 USD billions)
- 0
- Owner
- Meta
- Users
- Meta
- Selected Sources
- - Data center profile by Meta - Entergy's application for generation and transmission resources - MISO update with 1.8 GW substation plan - S&P Global ratings research with 2.064 GW campus details
- Calculations sheet
- https://docs.google.com/spreadsheets/d/1cyXcZ_jIsJDjuPKx6_J1scIWeq0-rfM3-2GcSKN4oA0/edit?usp=sharing
- Project
- Hyperion
- Current chip types
- Not reported
- All chip types
- Rubin
- Investors
- Not reported
- Construction companies
- Mortenson
- Energy companies
- Entergy
- Country
- United States
- Address
- Holly Ridge, LA 71269